Connecting...

M&E Engineer (Data Center Construction)

役職名: M&E Engineer (Data Center Construction)
勤務地: Kuala Lumpur
給与: MYR 72,000 - 84,000 (Annual)
求人番号: PR/156626
求人情報掲載日: 2024/01/31 23:09
Our client is an international main contractor with projects in data center, semicon factory, commercial and residential projects, highrise building.

JOB RESPONSIBILITIES
  • To understand Project policy for safety, schedule, cost and quality and support Project Manager to achieve them on all site activities.
  • To check for discrepancy between design and M&E construction drawings.
  • To ensure the constructions are as per approved design and use of materials and components.
  • To liaise with M&E subcontractors/suppliers and customers.
  • To check, supervise and report on the performance of the M&E subcontractors and suppliers.
  • To jointly prepare with the specialist M&E subcontractors, the various work method statements and/or Safe Operating Procedures when required.
  • To monitor and periodically report to the Project Manager the project’s progress status at the interval as directed by the Project Manager.
JOB REQUIREMENTS
  • Possess a degree in Mechanical or Electrical Engineering
  • Minimum 4 years of working experience in construction M&E and Data Center projects
  • Willing to work outstation and relocate within Malaysia as and when required by projects